Actions

Difference between revisions of "Schedules"

From VersaVision Support

Line 26: Line 26:
<span id="EDIT"></span>
<span id="EDIT"></span>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''EDIT A SCHEDULE'''</u></span></div>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''EDIT A SCHEDULE'''</u></span></div>
<BR>
'''Step. 1'''
<BR>
<BR>
On the Schedules page, click on the 3 dot menu for the Schedule the needs to be edited.
On the Schedules page, click on the 3 dot menu for the Schedule the needs to be edited.
Line 35: Line 33:
</gallery>
</gallery>
----
----
<BR>
'''Step. 2'''
<BR>
<BR>
Select Edit from the pop-up menu.
Select Edit from the pop-up menu.
Line 44: Line 40:
</gallery>
</gallery>
----
----
<BR>
'''Step. 3'''
<BR>
<BR>
The Edit Schedule page will load, click in the Name field to edit the name of the Schedule.
The Edit Schedule page will load, click in the Name field to edit the name of the Schedule.
Line 53: Line 47:
</gallery>
</gallery>
----
----
<BR>
'''Step. 4'''
<BR>
<BR>
Click on the Clock Icon in the Start field to change the starting time of the Schedule.
Click on the Clock Icon in the Start field to change the starting time of the Schedule.
Line 62: Line 54:
</gallery>
</gallery>
----
----
<BR>
'''Step. 5'''
<BR>
<BR>
Click in the Description field to enter a description for the Schedule. This will show on the Schedules list, this is an optional field.
Click in the Description field to enter a description for the Schedule. This will show on the Schedules list, this is an optional field.
Line 71: Line 61:
</gallery>
</gallery>
----
----
<BR>
'''Step. 6'''
<BR>
<BR>
Click on the Add Shift button to Add a New Shift to the Schedule.
Click on the Add Shift button to Add a New Shift to the Schedule.
Line 80: Line 68:
</gallery>
</gallery>
----
----
<BR>
'''Step. 7'''
<BR>
<BR>
Click on the Shift Name field to change the name of the Shift.
Click on the Shift Name field to change the name of the Shift.
Line 89: Line 75:
</gallery>
</gallery>
----
----
<BR>
'''Step. 8'''
<BR>
<BR>
Click on the Clock Icon in the Shift Start field to change the starting time of the shift.
Click on the Clock Icon in the Shift Start field to change the starting time of the shift.
Line 98: Line 82:
</gallery>
</gallery>
----
----
<BR>
'''Step. 9'''
<BR>
<BR>
Click on the Clock Icon in the Shift End field to change the ending time of the shift.
Click on the Clock Icon in the Shift End field to change the ending time of the shift.
Line 107: Line 89:
</gallery>
</gallery>
----
----
<BR>
'''Step. 10'''
<BR>
<BR>
Click on the individual Day Icons in the Days Active to either enable or disable a day of the week for the Shift.
Click on the individual Day Icons in the Days Active to either enable or disable a day of the week for the Shift.
Line 116: Line 96:
</gallery>
</gallery>
----
----
<BR>
'''Step. 11'''
<BR>
<BR>
Click on the Tags Text to add a tag for the Shift.
Click on the Tags Text to add a tag for the Shift.
Line 125: Line 103:
</gallery>
</gallery>
----
----
<BR>
'''Step. 12'''
<BR>
<BR>
The user can either select an existing tag from the list or enter a new tag.
The user can either select an existing tag from the list or enter a new tag.
Line 134: Line 110:
</gallery>
</gallery>
----
----
<BR>
'''Step. 13'''
<BR>
<BR>
Once a tag has been entered or selected, click on the Add button.
Once a tag has been entered or selected, click on the Add button.
Line 143: Line 117:
</gallery>
</gallery>
----
----
<BR>
'''Step. 14'''
<BR>
<BR>
To remove a tag from a Shift, click on the "X" on the appropriate tag icon.
To remove a tag from a Shift, click on the "X" on the appropriate tag icon.
Line 152: Line 124:
</gallery>
</gallery>
----
----
<BR>
'''Step. 15'''
<BR>
<BR>
Click on the Add Break button to add a break to the Shift.
Click on the Add Break button to add a break to the Shift.
Line 161: Line 131:
</gallery>
</gallery>
----
----
<BR>
'''Step. 16'''
<BR>
<BR>
Select either a Fixed or Flexible break from the pop-up menu.
Select either a Fixed or Flexible break from the pop-up menu.
<BR>
::'''Fixed Break''' - this is a break that will occur at the same time everyday and never change.
:'''Fixed Break''' - this is a break that will occur at the same time everyday and never change.
::'''Flexible Break''' - this is a break where the Operator has the ability to take the break at any time during the shift.
:'''Flexible Break''' - this is a break where the Operator has the ability to take the break at any time during the shift.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-16.png
File:Schedule-16.png
Line 173: Line 140:
----
----
<BR>
<BR>
'''Step. 17'''
 
<BR>
If a Fixed Break has been added to the Shift, the user will see the following fields.
If a Fixed Break has been added to the Shift, the user will see the following fields.
<BR>
::'''Break Name''' - click in this field to change the name of the Break.
:'''Break Name''' - click in this field to change the name of the Break.
::'''Type''' - this field will show as Fixed. Click on the down arrow in the field to change the break the Flexible.
:'''Type''' - this field will show as Fixed. Click on the down arrow in the field to change the break the Flexible.
::'''Start Time''' - click on the Clock Icon to change the starting time of the Break.
:'''Start Time''' - click on the Clock Icon to change the starting time of the Break.
::'''End Time''' - click on the Clock Icon to change the ending time of the Break
:'''End Time''' - click on the Clock Icon to change the ending time of the Break
::'''Delete''' - click on the Delete Icon to remove a Break from the Shift.
:'''Delete''' - click on the Delete Icon to remove a Break from the Shift.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-17.png
File:Schedule-17.png
</gallery>
</gallery>
----
----
<BR>
'''Step. 18'''
<BR>
<BR>
If a Flexible Break has been selected to the Shift, the user will see the following fields.
If a Flexible Break has been selected to the Shift, the user will see the following fields.
Line 199: Line 162:
</gallery>
</gallery>
----
----
<BR>
'''Step. 19'''
<BR>
<BR>
To remove a Shift from a Schedule, click on the 3 dot menu next to the Shift Name field.
To remove a Shift from a Schedule, click on the 3 dot menu next to the Shift Name field.
Line 208: Line 169:
</gallery>
</gallery>
----
----
<BR>
'''Step. 20'''
<BR>
<BR>
Select Delete from the pop-up menu.
Select Delete from the pop-up menu.
Line 217: Line 176:
</gallery>
</gallery>
----
----
<BR>
'''Step. 21'''
<BR>
<BR>
The Shift that was selected to be removed will no longer show on the Schedule.
The Shift that was selected to be removed will no longer show on the Schedule.
Line 226: Line 183:
</gallery>
</gallery>
----
----
<BR>
'''Step. 22'''
<BR>
<BR>
Select the Save button at the top of the page to save the changes made to the Schedule.
Select the Save button at the top of the page to save the changes made to the Schedule.
Line 235: Line 190:
</gallery>
</gallery>
----
----
<BR>
'''Step. 23'''
<BR>
<BR>
Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.
Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.
Line 252: Line 205:
<span id="ADD"></span>
<span id="ADD"></span>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''ADD A SCHEDULE'''</u></span></div>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''ADD A SCHEDULE'''</u></span></div>
<BR>
'''Step. 1'''
<BR>
<BR>
On the Schedules page, click on the Add New button at the top of the Schedules list.
On the Schedules page, click on the Add New button at the top of the Schedules list.
Line 261: Line 212:
</gallery>
</gallery>
----
----
<BR>
'''Step. 2'''
<BR>
<BR>
Select Standard Schedule from the pop-up menu.
Select Standard Schedule from the pop-up menu.
Line 270: Line 219:
</gallery>
</gallery>
----
----
<BR>
'''Step. 3'''
<BR>
<BR>
The New Schedule page will load, click in the Name field to enter a name for the Schedule.
The New Schedule page will load, click in the Name field to enter a name for the Schedule.
Line 279: Line 226:
</gallery>
</gallery>
----
----
<BR>
'''Step. 4'''
<BR>
<BR>
Click on the Clock Icon in the Start field to enter the starting time of the Schedule.
Click on the Clock Icon in the Start field to enter the starting time of the Schedule.
Line 288: Line 233:
</gallery>
</gallery>
----
----
<BR>
'''Step. 5'''
<BR>
<BR>
Click in the Description field to enter a description for the Schedule. This will show on the Schedules list, this is an optional field.
Click in the Description field to enter a description for the Schedule. This will show on the Schedules list, this is an optional field.
Line 297: Line 240:
</gallery>
</gallery>
----
----
<BR>
'''Step. 6'''
<BR>
<BR>
Click on the Add Shift button to Add a Shift to the Schedule.
Click on the Add Shift button to Add a Shift to the Schedule.
Line 306: Line 247:
</gallery>
</gallery>
----
----
<BR>
'''Step. 7'''
<BR>
<BR>
Click on the Shift Name field to enter a name for the Shift.
Click on the Shift Name field to enter a name for the Shift.
Line 315: Line 254:
</gallery>
</gallery>
----
----
<BR>
'''Step. 8'''
<BR>
<BR>
Click on the Clock Icon in the Shift Start field to enter the starting time of the Shift.
Click on the Clock Icon in the Shift Start field to enter the starting time of the Shift.
Line 324: Line 261:
</gallery>
</gallery>
----
----
<BR>
'''Step. 9'''
<BR>
<BR>
Click on the Clock Icon in the Shift End field to enter the ending time of the Shift.
Click on the Clock Icon in the Shift End field to enter the ending time of the Shift.
Line 333: Line 268:
</gallery>
</gallery>
----
----
<BR>
'''Step. 10'''
<BR>
<BR>
Click on the individual Day Icons in the Days Active to either enable or disable a day of the week for the Shift.
Click on the individual Day Icons in the Days Active to either enable or disable a day of the week for the Shift.
Line 342: Line 275:
</gallery>
</gallery>
----
----
<BR>
'''Step. 11'''
<BR>
<BR>
Click on the Tags Text to add a tag for the Shift.
Click on the Tags Text to add a tag for the Shift.
Line 351: Line 282:
</gallery>
</gallery>
----
----
<BR>
'''Step. 12'''
<BR>
<BR>
The user can either select an existing tag from the list or enter a new tag.
The user can either select an existing tag from the list or enter a new tag.
Line 360: Line 289:
</gallery>
</gallery>
----
----
<BR>
'''Step. 13'''
<BR>
<BR>
Once a tag has been entered or selected, click on the Add button.
Once a tag has been entered or selected, click on the Add button.
Line 369: Line 296:
</gallery>
</gallery>
----
----
<BR>
'''Step. 14'''
<BR>
<BR>
To remove a tag from a Shift, click on the "X" on the appropriate tag icon.
To remove a tag from a Shift, click on the "X" on the appropriate tag icon.
Line 378: Line 303:
</gallery>
</gallery>
----
----
<BR>
'''Step. 15'''
<BR>
<BR>
Click on the Add Break button to add a break to the Shift.
Click on the Add Break button to add a break to the Shift.
Line 387: Line 310:
</gallery>
</gallery>
----
----
<BR>
'''Step. 16'''
<BR>
<BR>
Select either a Fixed or Flexible break from the pop-up menu.
Select either a Fixed or Flexible break from the pop-up menu.
Line 398: Line 319:
</gallery>
</gallery>
----
----
<BR>
'''Step. 17'''
<BR>
<BR>
If a Fixed Break has been selected to the Shift, the user will see the following fields.
If a Fixed Break has been selected to the Shift, the user will see the following fields.
<BR>
::'''Break Name''' - click in this field to enter an name for the Break.
:'''Break Name''' - click in this field to enter an name for the Break.
::'''Type''' - this field will show as Fixed.  
:'''Type''' - this field will show as Fixed.  
::'''Start Time''' - click on the Clock Icon to enter the starting time of the Break.
:'''Start Time''' - click on the Clock Icon to enter the starting time of the Break.
::'''End Time''' - click on the Clock Icon to enter the ending time of the Break
:'''End Time''' - click on the Clock Icon to enter the ending time of the Break
::'''Delete''' - click on the Delete Icon to remove the Break.
:'''Delete''' - click on the Delete Icon to remove the Break.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-42.png
File:Schedule-42.png
</gallery>
</gallery>
----
----
<BR>
'''Step. 18'''
<BR>
<BR>
If a Flexible Break has been selected to the Shift, the user will see the following fields.
If a Flexible Break has been selected to the Shift, the user will see the following fields.
<BR>
::'''Break Name''' - click in this field to enter an name for the Break.
:'''Break Name''' - click in this field to enter an name for the Break.
::'''Type''' - this field will show as Flexible.  
:'''Type''' - this field will show as Flexible.  
::'''Duration''' - enter the amount of Minutes for the duration of the break.
:'''Duration''' - enter the amount of Minutes for the duration of the break.
::'''Delete''' - click on the Delete Icon to remove the Break.
:'''Delete''' - click on the Delete Icon to remove the Break.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-43.png
File:Schedule-43.png
</gallery>
</gallery>
----
----
<BR>
'''Step. 19'''
<BR>
<BR>
Add additional Shifts to the Schedule by clicking on the Add Shift button and following the same steps listed above.
Add additional Shifts to the Schedule by clicking on the Add Shift button and following the same steps listed above.
Line 434: Line 347:
</gallery>
</gallery>
----
----
<BR>
'''Step. 20'''
<BR>
<BR>
After all Shifts have been added to the Schedule, click on the Save button at the top of the page.
After all Shifts have been added to the Schedule, click on the Save button at the top of the page.
Line 443: Line 354:
</gallery>
</gallery>
----
----
<BR>
'''Step. 21'''
<BR>
<BR>
Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.
Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.
Line 452: Line 361:
</gallery>
</gallery>
----
----
<BR>
'''Step. 22'''
<BR>
<BR>
The New Schedule that was added will now show in the Schedules List.
The New Schedule that was added will now show in the Schedules List.
Line 469: Line 376:
<span id="COPY"></span>
<span id="COPY"></span>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''DUPLICATE A SCHEDULE'''</u></span></div>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''DUPLICATE A SCHEDULE'''</u></span></div>
<BR>
'''Step. 1'''
<BR>
<BR>
On the Schedules page click on the 3 dot menu for the Schedule that needs to be duplicated.  
On the Schedules page click on the 3 dot menu for the Schedule that needs to be duplicated.  
Line 478: Line 383:
</gallery>
</gallery>
----
----
<BR>
'''Step. 2'''
<BR>
<BR>
Select Duplicate from the pop-up menu.
Select Duplicate from the pop-up menu.
Line 487: Line 390:
</gallery>
</gallery>
----
----
<BR>
'''Step. 3'''
<BR>
<BR>
The Copy Schedule page will load. Click in the Shift Name field and enter a name for the duplicated Schedule.
The Copy Schedule page will load. Click in the Shift Name field and enter a name for the duplicated Schedule.
Line 496: Line 397:
</gallery>
</gallery>
----
----
<BR>
'''Step. 4'''
<BR>
<BR>
Change/Edit any other property for the Schedule that is needed.  
Change/Edit any other property for the Schedule that is needed.  
Line 505: Line 404:
</gallery>
</gallery>
----
----
<BR>
'''Step. 5'''
<BR>
<BR>
Select the Save button once all changes have been made to the Schedule.
Select the Save button once all changes have been made to the Schedule.
Line 514: Line 411:
</gallery>
</gallery>
----
----
<BR>
'''Step. 6'''
<BR>
<BR>
Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.
Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.
Line 531: Line 426:
<span id="DELETE"></span>
<span id="DELETE"></span>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''DELETE A SCHEDULE'''</u></span></div>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''DELETE A SCHEDULE'''</u></span></div>
<BR>
'''Step. 1'''
<BR>
<BR>
On the Schedules page, click on the 3 dot menu for the Schedule the needs to be removed.  
On the Schedules page, click on the 3 dot menu for the Schedule the needs to be removed.  
Line 540: Line 433:
</gallery>
</gallery>
----
----
<BR>
'''Step. 2'''
<BR>
<BR>
Select Delete from the pop-up menu.
Select Delete from the pop-up menu.
Line 549: Line 440:
</gallery>
</gallery>
----
----
<BR>
'''Step. 3'''
<BR>
<BR>
A confirmation window will show on the screen. Select Delete to remove the Schedule. Select Cancel to keep the Schedule.
A confirmation window will show on the screen. Select Delete to remove the Schedule. Select Cancel to keep the Schedule.
Line 566: Line 455:
<span id="DEFAULT"></span>
<span id="DEFAULT"></span>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''SET A SCHEDULE AS THE DEFAULT'''</u></span></div>
<div style="text-align: center;"><span style="color:#0054a6; font-size:150%;"><u>'''SET A SCHEDULE AS THE DEFAULT'''</u></span></div>
<BR>
'''Step. 1'''
<BR>
<BR>
On the Schedules page, click on the 3 dot menu for the Schedule the needs to be made the System Default.  
On the Schedules page, click on the 3 dot menu for the Schedule the needs to be made the System Default.  
Line 575: Line 462:
</gallery>
</gallery>
----
----
<BR>
'''Step. 2'''
<BR>
<BR>
Select Set as Default from the pop-up menu.
Select Set as Default from the pop-up menu.
Line 584: Line 469:
</gallery>
</gallery>
----
----
<BR>
'''Step. 3'''
<BR>
<BR>
On the Schedules list, the Schedule that was selected to be the Default will now have a Default Tag icon.
On the Schedules list, the Schedule that was selected to be the Default will now have a Default Tag icon.

Revision as of 17:09, 2 February 2023

OVERVIEW


Schedules is where a user will setup the start and end time of a shift and breaks.

Schedules are used for Contact, Modules, Reports and Dashboards. Multiple Schedules can be setup to account for the needs of each segment.

This page will concentrate on Adding, Editing, Duplicating, Deleting and Setting a Schedule as the Default.


NAVIGATION


Schedules can be accessed via the Home page menu or the Schedules icon.



Edit       Add       Duplicate       Delete       Set as Default


EDIT A SCHEDULE


On the Schedules page, click on the 3 dot menu for the Schedule the needs to be edited.



Select Edit from the pop-up menu.



The Edit Schedule page will load, click in the Name field to edit the name of the Schedule.



Click on the Clock Icon in the Start field to change the starting time of the Schedule.



Click in the Description field to enter a description for the Schedule. This will show on the Schedules list, this is an optional field.



Click on the Add Shift button to Add a New Shift to the Schedule.



Click on the Shift Name field to change the name of the Shift.



Click on the Clock Icon in the Shift Start field to change the starting time of the shift.



Click on the Clock Icon in the Shift End field to change the ending time of the shift.



Click on the individual Day Icons in the Days Active to either enable or disable a day of the week for the Shift.



Click on the Tags Text to add a tag for the Shift.



The user can either select an existing tag from the list or enter a new tag.



Once a tag has been entered or selected, click on the Add button.



To remove a tag from a Shift, click on the "X" on the appropriate tag icon.



Click on the Add Break button to add a break to the Shift.



Select either a Fixed or Flexible break from the pop-up menu.

Fixed Break - this is a break that will occur at the same time everyday and never change.
Flexible Break - this is a break where the Operator has the ability to take the break at any time during the shift.


If a Fixed Break has been added to the Shift, the user will see the following fields.

Break Name - click in this field to change the name of the Break.
Type - this field will show as Fixed. Click on the down arrow in the field to change the break the Flexible.
Start Time - click on the Clock Icon to change the starting time of the Break.
End Time - click on the Clock Icon to change the ending time of the Break
Delete - click on the Delete Icon to remove a Break from the Shift.


If a Flexible Break has been selected to the Shift, the user will see the following fields.

Break Name - click in this field to change the name of the Break.
Type - this field will show as Flexible. Click on the down arrow in the field to change the break the Fixed.
Duration - click in this field to change the amount of Minutes for the duration of the break.
Delete - click on the Delete Icon to remove the Break from the Shift.


To remove a Shift from a Schedule, click on the 3 dot menu next to the Shift Name field.



Select Delete from the pop-up menu.



The Shift that was selected to be removed will no longer show on the Schedule.



Select the Save button at the top of the page to save the changes made to the Schedule.



Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.



Edit       Add       Duplicate       Delete       Set as Default


ADD A SCHEDULE


On the Schedules page, click on the Add New button at the top of the Schedules list.



Select Standard Schedule from the pop-up menu.



The New Schedule page will load, click in the Name field to enter a name for the Schedule.



Click on the Clock Icon in the Start field to enter the starting time of the Schedule.



Click in the Description field to enter a description for the Schedule. This will show on the Schedules list, this is an optional field.



Click on the Add Shift button to Add a Shift to the Schedule.



Click on the Shift Name field to enter a name for the Shift.



Click on the Clock Icon in the Shift Start field to enter the starting time of the Shift.



Click on the Clock Icon in the Shift End field to enter the ending time of the Shift.



Click on the individual Day Icons in the Days Active to either enable or disable a day of the week for the Shift.



Click on the Tags Text to add a tag for the Shift.



The user can either select an existing tag from the list or enter a new tag.



Once a tag has been entered or selected, click on the Add button.



To remove a tag from a Shift, click on the "X" on the appropriate tag icon.



Click on the Add Break button to add a break to the Shift.



Select either a Fixed or Flexible break from the pop-up menu.

Fixed Break - this is a break that will occur at the same time everyday and never change.
Flexible Break - this is a break where the Operator has the ability to take the break at any time during the shift.


If a Fixed Break has been selected to the Shift, the user will see the following fields.

Break Name - click in this field to enter an name for the Break.
Type - this field will show as Fixed.
Start Time - click on the Clock Icon to enter the starting time of the Break.
End Time - click on the Clock Icon to enter the ending time of the Break
Delete - click on the Delete Icon to remove the Break.


If a Flexible Break has been selected to the Shift, the user will see the following fields.

Break Name - click in this field to enter an name for the Break.
Type - this field will show as Flexible.
Duration - enter the amount of Minutes for the duration of the break.
Delete - click on the Delete Icon to remove the Break.


Add additional Shifts to the Schedule by clicking on the Add Shift button and following the same steps listed above.



After all Shifts have been added to the Schedule, click on the Save button at the top of the page.



Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.



The New Schedule that was added will now show in the Schedules List.



Edit       Add       Duplicate       Delete       Set as Default


DUPLICATE A SCHEDULE


On the Schedules page click on the 3 dot menu for the Schedule that needs to be duplicated.



Select Duplicate from the pop-up menu.



The Copy Schedule page will load. Click in the Shift Name field and enter a name for the duplicated Schedule.



Change/Edit any other property for the Schedule that is needed.



Select the Save button once all changes have been made to the Schedule.



Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.



Edit       Add       Duplicate       Delete       Set as Default


DELETE A SCHEDULE


On the Schedules page, click on the 3 dot menu for the Schedule the needs to be removed.



Select Delete from the pop-up menu.



A confirmation window will show on the screen. Select Delete to remove the Schedule. Select Cancel to keep the Schedule.



Edit       Add       Duplicate       Delete       Set as Default


SET A SCHEDULE AS THE DEFAULT


On the Schedules page, click on the 3 dot menu for the Schedule the needs to be made the System Default.



Select Set as Default from the pop-up menu.



On the Schedules list, the Schedule that was selected to be the Default will now have a Default Tag icon.


VC Footer.png
Follow Us On LinkedIn View our Blog