Actions

Difference between revisions of "Schedules"

From VersaVision Support

 
Line 15: Line 15:
<BR>
<BR>
<gallery widths=600px heights=198px>
<gallery widths=600px heights=198px>
File:Schedules-Home.png
File:Schedules-Home.png|link=Schedules
</gallery>
</gallery>
----
----
Line 28: Line 28:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-1.png
File:Schedule-1.png|link=Schedules
</gallery>
</gallery>
----
----
Line 35: Line 35:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-2.png
File:Schedule-2.png|link=Schedules
</gallery>
</gallery>
----
----
Line 42: Line 42:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-3.png
File:Schedule-3.png|link=Schedules
</gallery>
</gallery>
----
----
Line 49: Line 49:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-4.png
File:Schedule-4.png|link=Schedules
</gallery>
</gallery>
----
----
Line 56: Line 56:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-5.png
File:Schedule-5.png|link=Schedules
</gallery>
</gallery>
----
----
Line 63: Line 63:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-6.png
File:Schedule-6.png|link=Schedules
</gallery>
</gallery>
----
----
Line 70: Line 70:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-7.png
File:Schedule-7.png|link=Schedules
</gallery>
</gallery>
----
----
Line 77: Line 77:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-8.png
File:Schedule-8.png|link=Schedules
</gallery>
</gallery>
----
----
Line 84: Line 84:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-9.png
File:Schedule-9.png|link=Schedules
</gallery>
</gallery>
----
----
Line 91: Line 91:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-10.png
File:Schedule-10.png|link=Schedules
</gallery>
</gallery>
----
----
Line 98: Line 98:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-11.png
File:Schedule-11.png|link=Schedules
</gallery>
</gallery>
----
----
Line 105: Line 105:
<BR>
<BR>
<gallery widths=235px heights=220px>
<gallery widths=235px heights=220px>
File:Schedule-12.png
File:Schedule-12.png|link=Schedules
</gallery>
</gallery>
----
----
Line 112: Line 112:
<BR>
<BR>
<gallery widths=230px heights=197px>
<gallery widths=230px heights=197px>
File:Schedule-13.png
File:Schedule-13.png|link=Schedules
</gallery>
</gallery>
----
----
Line 119: Line 119:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-14.png
File:Schedule-14.png|link=Schedules
</gallery>
</gallery>
----
----
Line 126: Line 126:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-15.png
File:Schedule-15.png|link=Schedules
</gallery>
</gallery>
----
----
Line 134: Line 134:
::'''Flexible Break''' - this is a break where the Operator has the ability to take the break at any time during the shift.
::'''Flexible Break''' - this is a break where the Operator has the ability to take the break at any time during the shift.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-16.png
File:Schedule-16.png|link=Schedules
</gallery>
</gallery>
----
----
Line 145: Line 145:
::'''Delete''' - click on the Delete Icon to remove a Break from the Shift.
::'''Delete''' - click on the Delete Icon to remove a Break from the Shift.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-17.png
File:Schedule-17.png|link=Schedules
</gallery>
</gallery>
----
----
Line 155: Line 155:
:'''Delete''' - click on the Delete Icon to remove the Break from the Shift.
:'''Delete''' - click on the Delete Icon to remove the Break from the Shift.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-18.png
File:Schedule-18.png|link=Schedules
</gallery>
</gallery>
----
----
Line 162: Line 162:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-19.png
File:Schedule-19.png|link=Schedules
</gallery>
</gallery>
----
----
Line 169: Line 169:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-20.png
File:Schedule-20.png|link=Schedules
</gallery>
</gallery>
----
----
Line 176: Line 176:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-21.png
File:Schedule-21.png|link=Schedules
</gallery>
</gallery>
----
----
Line 183: Line 183:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-22.png
File:Schedule-22.png|link=Schedules
</gallery>
</gallery>
----
----
Line 190: Line 190:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-23.png
File:Schedule-23.png|link=Schedules
</gallery>
</gallery>
----
----
Line 203: Line 203:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-25.png
File:Schedule-25.png|link=Schedules
</gallery>
</gallery>
----
----
Line 210: Line 210:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-26.png
File:Schedule-26.png|link=Schedules
</gallery>
</gallery>
----
----
Line 217: Line 217:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-27.png
File:Schedule-27.png|link=Schedules
</gallery>
</gallery>
----
----
Line 224: Line 224:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-28.png
File:Schedule-28.png|link=Schedules
</gallery>
</gallery>
----
----
Line 231: Line 231:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-29.png
File:Schedule-29.png|link=Schedules
</gallery>
</gallery>
----
----
Line 238: Line 238:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-31.png
File:Schedule-31.png|link=Schedules
</gallery>
</gallery>
----
----
Line 245: Line 245:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-32.png
File:Schedule-32.png|link=Schedules
</gallery>
</gallery>
----
----
Line 252: Line 252:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-33.png
File:Schedule-33.png|link=Schedules
</gallery>
</gallery>
----
----
Line 259: Line 259:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-34.png
File:Schedule-34.png|link=Schedules
</gallery>
</gallery>
----
----
Line 266: Line 266:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-35.png
File:Schedule-35.png|link=Schedules
</gallery>
</gallery>
----
----
Line 273: Line 273:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-36.png
File:Schedule-36.png|link=Schedules
</gallery>
</gallery>
----
----
Line 280: Line 280:
<BR>
<BR>
<gallery widths=235px heights=220px>
<gallery widths=235px heights=220px>
File:Schedule-12.png
File:Schedule-12.png|link=Schedules
</gallery>
</gallery>
----
----
Line 287: Line 287:
<BR>
<BR>
<gallery widths=230px heights=197px>
<gallery widths=230px heights=197px>
File:Schedule-13.png
File:Schedule-13.png|link=Schedules
</gallery>
</gallery>
----
----
Line 294: Line 294:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-39.png
File:Schedule-39.png|link=Schedules
</gallery>
</gallery>
----
----
Line 301: Line 301:
<BR>
<BR>
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-40.png
File:Schedule-40.png|link=Schedules
</gallery>
</gallery>
----
----
Line 309: Line 309:
:'''Flexible Break''' - this is a break where the Operator has the ability to take the break at any time during the shift.
:'''Flexible Break''' - this is a break where the Operator has the ability to take the break at any time during the shift.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-41.png
File:Schedule-41.png|link=Schedules
</gallery>
</gallery>
----
----
Line 320: Line 320:
::'''Delete''' - click on the Delete Icon to remove the Break.
::'''Delete''' - click on the Delete Icon to remove the Break.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-42.png
File:Schedule-42.png|link=Schedules
</gallery>
</gallery>
----
----
Line 330: Line 330:
::'''Delete''' - click on the Delete Icon to remove the Break.
::'''Delete''' - click on the Delete Icon to remove the Break.
<gallery widths=550px heights=494px>
<gallery widths=550px heights=494px>
File:Schedule-43.png
File:Schedule-43.png|link=Schedules
</gallery>
</gallery>
----
----
Line 337: Line 337:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-44.png
File:Schedule-44.png|link=Schedules
</gallery>
</gallery>
----
----
Line 344: Line 344:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-45.png
File:Schedule-45.png|link=Schedules
</gallery>
</gallery>
----
----
Line 351: Line 351:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-46.png
File:Schedule-46.png|link=Schedules
</gallery>
</gallery>
----
----
Line 358: Line 358:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-47.png
File:Schedule-47.png|link=Schedules
</gallery>
</gallery>
----
----
Line 371: Line 371:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-48.png
File:Schedule-48.png|link=Schedules
</gallery>
</gallery>
----
----
Line 378: Line 378:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-49.png
File:Schedule-49.png|link=Schedules
</gallery>
</gallery>
----
----
Line 385: Line 385:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-50.png
File:Schedule-50.png|link=Schedules
</gallery>
</gallery>
----
----
Line 392: Line 392:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-51.png
File:Schedule-51.png|link=Schedules
</gallery>
</gallery>
----
----
Line 399: Line 399:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-52.png
File:Schedule-52.png|link=Schedules
</gallery>
</gallery>
----
----
Line 406: Line 406:
<BR>
<BR>
<gallery widths=550px heights=353px>
<gallery widths=550px heights=353px>
File:Schedule-53.png
File:Schedule-53.png|link=Schedules
</gallery>
</gallery>
----
----
Line 419: Line 419:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-54.png
File:Schedule-54.png|link=Schedules
</gallery>
</gallery>
----
----
Line 426: Line 426:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-55.png
File:Schedule-55.png|link=Schedules
</gallery>
</gallery>
----
----
Line 433: Line 433:
<BR>
<BR>
<gallery widths=400px heights=134px>
<gallery widths=400px heights=134px>
File:Schedule-56.png
File:Schedule-56.png|link=Schedules
</gallery>
</gallery>
----
----
Line 446: Line 446:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-57.png
File:Schedule-57.png|link=Schedules
</gallery>
</gallery>
----
----
Line 453: Line 453:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-58.png
File:Schedule-58.png|link=Schedules
</gallery>
</gallery>
----
----
Line 460: Line 460:
<BR>
<BR>
<gallery widths=600px heights=283px>
<gallery widths=600px heights=283px>
File:Schedule-59.png
File:Schedule-59.png|link=Schedules
</gallery>
</gallery>
----
----

Latest revision as of 15:49, 10 July 2023

OVERVIEW


Schedules is where a user will setup the start and end time of a shift and breaks.

Schedules are used for Contact, Modules, Reports and Dashboards. Multiple Schedules can be setup to account for the needs of each segment.

This page will concentrate on Adding, Editing, Duplicating, Deleting and Setting a Schedule as the Default.


NAVIGATION


Schedules can be accessed via the Home page menu or the Schedules icon.


Edit       Add       Duplicate       Delete       Set as Default      


EDIT A SCHEDULE


On the Schedules page, click on the 3 dot menu for the Schedule the needs to be edited.



Select Edit from the pop-up menu.



The Edit Schedule page will load, click in the Name field to edit the name of the Schedule.



Click on the Clock Icon in the Start field to change the starting time of the Schedule.



Click in the Description field to enter a description for the Schedule. This will show on the Schedules list, this is an optional field.



Click on the Add Shift button to Add a New Shift to the Schedule.



Click on the Shift Name field to change the name of the Shift.



Click on the Clock Icon in the Shift Start field to change the starting time of the shift.



Click on the Clock Icon in the Shift End field to change the ending time of the shift.



Click on the individual Day Icons in the Days Active to either enable or disable a day of the week for the Shift.



Click on the Tags Text to add a tag for the Shift.



The user can either select an existing tag from the list or enter a new tag.



Once a tag has been entered or selected, click on the Add button.



To remove a tag from a Shift, click on the "X" on the appropriate tag icon.



Click on the Add Break button to add a break to the Shift.



Select either a Fixed or Flexible break from the pop-up menu.

Fixed Break - this is a break that will occur at the same time everyday and never change.
Flexible Break - this is a break where the Operator has the ability to take the break at any time during the shift.


If a Fixed Break has been added to the Shift, the user will see the following fields.

Break Name - click in this field to change the name of the Break.
Type - this field will show as Fixed. Click on the down arrow in the field to change the break the Flexible.
Start Time - click on the Clock Icon to change the starting time of the Break.
End Time - click on the Clock Icon to change the ending time of the Break
Delete - click on the Delete Icon to remove a Break from the Shift.


If a Flexible Break has been selected to the Shift, the user will see the following fields.

Break Name - click in this field to change the name of the Break.
Type - this field will show as Flexible. Click on the down arrow in the field to change the break the Fixed.
Duration - click in this field to change the amount of Minutes for the duration of the break.
Delete - click on the Delete Icon to remove the Break from the Shift.


To remove a Shift from a Schedule, click on the 3 dot menu next to the Shift Name field.



Select Delete from the pop-up menu.



The Shift that was selected to be removed will no longer show on the Schedule.



Select the Save button at the top of the page to save the changes made to the Schedule.



Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.


Edit       Add       Duplicate       Delete       Set as Default      


ADD A SCHEDULE


On the Schedules page, click on the Add New button at the top of the Schedules list.



Select Standard Schedule from the pop-up menu.



The New Schedule page will load, click in the Name field to enter a name for the Schedule.



Click on the Clock Icon in the Start field to enter the starting time of the Schedule.



Click in the Description field to enter a description for the Schedule. This will show on the Schedules list, this is an optional field.



Click on the Add Shift button to Add a Shift to the Schedule.



Click on the Shift Name field to enter a name for the Shift.



Click on the Clock Icon in the Shift Start field to enter the starting time of the Shift.



Click on the Clock Icon in the Shift End field to enter the ending time of the Shift.



Click on the individual Day Icons in the Days Active to either enable or disable a day of the week for the Shift.



Click on the Tags Text to add a tag for the Shift.



The user can either select an existing tag from the list or enter a new tag.



Once a tag has been entered or selected, click on the Add button.



To remove a tag from a Shift, click on the "X" on the appropriate tag icon.



Click on the Add Break button to add a break to the Shift.



Select either a Fixed or Flexible break from the pop-up menu.

Fixed Break - this is a break that will occur at the same time everyday and never change.
Flexible Break - this is a break where the Operator has the ability to take the break at any time during the shift.


If a Fixed Break has been selected to the Shift, the user will see the following fields.

Break Name - click in this field to enter an name for the Break.
Type - this field will show as Fixed.
Start Time - click on the Clock Icon to enter the starting time of the Break.
End Time - click on the Clock Icon to enter the ending time of the Break
Delete - click on the Delete Icon to remove the Break.


If a Flexible Break has been selected to the Shift, the user will see the following fields.

Break Name - click in this field to enter an name for the Break.
Type - this field will show as Flexible.
Duration - enter the amount of Minutes for the duration of the break.
Delete - click on the Delete Icon to remove the Break.


Add additional Shifts to the Schedule by clicking on the Add Shift button and following the same steps listed above.



After all Shifts have been added to the Schedule, click on the Save button at the top of the page.



Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.



The New Schedule that was added will now show in the Schedules List.


Edit       Add       Duplicate       Delete       Set as Default      


DUPLICATE A SCHEDULE


On the Schedules page click on the 3 dot menu for the Schedule that needs to be duplicated.



Select Duplicate from the pop-up menu.



The Copy Schedule page will load. Click in the Shift Name field and enter a name for the duplicated Schedule.



Change/Edit any other property for the Schedule that is needed.



Select the Save button once all changes have been made to the Schedule.



Select the "X" next to the Save button to exit the Schedule edit menu and return to the Schedules List.


Edit       Add       Duplicate       Delete       Set as Default      


DELETE A SCHEDULE


On the Schedules page, click on the 3 dot menu for the Schedule the needs to be removed.



Select Delete from the pop-up menu.



A confirmation window will show on the screen. Select Delete to remove the Schedule. Select Cancel to keep the Schedule.


Edit       Add       Duplicate       Delete       Set as Default      


SET A SCHEDULE AS THE DEFAULT


On the Schedules page, click on the 3 dot menu for the Schedule the needs to be made the System Default.



Select Set as Default from the pop-up menu.



On the Schedules list, the Schedule that was selected to be the Default will now have a Default Tag icon.


Edit       Add       Duplicate       Delete       Set as Default      


VC Footer.png
Follow Us On LinkedIn View our Blog