Reporting - Schedule Parameter
From VersaVision Support
- OVERVIEW
- Depending on how the Report was built, it may require the user to setup a Schedule Parameter.
- This parameter defines what specific Schedule is to be used on the report.
- By default, the report will use the Schedule that is linked to the Location/Module.
- This page will show and explain each option available for this type of Parameter.
- DETAILS
- By default the Schedule Parameter will be turned off.
- To select a specific Schedule for the report toggle Override Schedule On.