Reporting - Schedule Parameter
From VersaVision Support
Depending on how the Report was built, it may require the user to setup a Schedule Parameter.
This parameter defines what specific Schedule is to be used on the report. By default, the report will use the Schedule that is linked to the Location/Module.
This page will show and explain each option available for this type of Parameter.
By default the the Schedule Parameter will be turned off. To select a specific Schedule for the report toggle the Override Schedule On.
When toggled/on a Schedule field will load. This field is where the user will select the specific Schedule to be used for the report.
Click on the down arrow for a list of schedules available.
Select a schedule from the list.
Leave the Variations field set to Default. This is a feature that will be added at a future date.